The Au Shue Hung Memorial Library archive renovation at Hong Kong Baptist University exemplifies how function and precision engineering can elevate institutional efficiency. The installation of a full-scale Compactus movable shelving system redefined how space, storage, and accessibility interact within a university setting.

Through a balance of technical execution and design discipline, the renewed archive now functions as a high-capacity, color-coded system—robust, organized, and future-ready for decades of academic preservation.

Project details

Construction Duration

~3 months

Location

KOWLOON TONG

Signature materials

Compactus Shelving System: Steel modular panels with epoxy powder-coated finish (color-coded: Red / Blue / Green / Yellow)

Area

9000 sqft.

Year

2018

CONCEPT & DESIGN INTENT

The project demanded precise coordination with the builder and supplier due to the complexity of the compact shelving installation. Floor load bearing and alignment tolerances were tightly controlled. All phases were executed within a restricted operational window, achieving full completion within three months.

SPATIAL STRATEGY

The compactus layout follows a zoned color-coding system, dividing the vast archive into distinct sections for easy reference. Clear circulation corridors were defined for both manual operation and safe access. The space planning was optimized for operational efficiency and safety, with tracks, ventilation, and lighting carefully integrated.

GALLERY

MATERIALITY & DETAILING

Industrial-grade steel shelving, durable epoxy coatings, and anti-slip flooring were selected for long-term endurance.

The exposed ceiling retains a functional aesthetic, with M&E elements visually unified through a consistent matte grey tone. Color-coded steel finishes add subtle orientation cues while reinforcing institutional order.

PROJECT GOALS & OUTCOMES

The renovation delivered a streamlined and durable archival environment, maximizing capacity without expanding the footprint. The new system improved organization, accessibility, and workflow, supporting long-term academic preservation. Coordination with the university’s facility team ensured zero disruption to ongoing operations.

COLLABORATION & CONSTRAINTS

The project demanded precise coordination with the builder and supplier due to the complexity of the compact shelving installation. Floor load bearing and alignment tolerances were tightly controlled. All phases were executed within a restricted operational window, achieving full completion within three months.

HONG KONG BAPTIST UNIVERSITY
AU SHUE HUNG
MEMORIAL LIBRARY

KOWLOON TONG